TriRoof HPX Hybrid Polymer Liquid Roofing System - 14KG
TriRoof HPX Hybrid Polymer Liquid Roofing System - 14KG
TriRoof
Description
Description
HPX is a ready‑to‑use hybrid liquid roofing solution designed for new and existing flat roofs.
With no mixing, hardeners or primer required on many substrates, it offers fast, simple installation for flat roof repair and overlay projects.
HPX forms a damp‑tolerant membrane, enabling year‑round application—even in damp conditions—and adheres to almost all common substrates including rubber, concrete, metal and flooring.
Available in Graphite Grey.
HPX delivers a durable, versatile and time‑saving alternative within the TriRoof range of flat roofing products.
Coverage:
Indicatively: 0.27 – 0.31 lb/ft2 (1.3 – 1.5 kg/m2) in one or two layers, in approx. 0.04’’ (1 mm) thickness. Recommended coverage, in total, 0.53 – 0.61 lb/ft2 (2.6 – 3 kg/m2 ) (without the use of FABRIC)
HPX is waterproof, UV resistant and has a 10 year guarantee. Adding a second layer with the HPX reinforcement kit will guarantee your roof for 20 years. To activate your product guarantee, please register online
Product Features:
- UV Resistant
- Environment friendly Environment friendly. Does not contain bitumen, isocyanate and solvent
- To be applied on dry and damp surfaces without lining
- Can be used on indoor and outdoor surfaces, horizontal and vertical surfaces
- Easy to apply (brush, short hair roll, airless gun, notched trowel)
- Excellent adhesion
- Building a bridge of cracks
- High elasticity
- Paintable
- Water vapor permeability
- Excellent resistance to weather conditions (temperature, water and freezing
Application Areas:
- Concrete, ceramic, tile, wood, glass, polycarbonate, GRP, metal. stone, marble, tile, brick, betopan, gas concrete, all kinds of vertical and horizontal surface
- In the waterproofing and repair of chimney joints, wall floor anchor points, water drainage, roof lights, rain gutters
- Balcony, terrace, roof and roof streams
- Drinking water tanks and pools
- Repair of joints of bitumen and slate membranes
- All types of ceramics, bathrooms, kitchens and other wet areas
- Waterproofing on thermal insulation applications (PU foam, EPS, XPS etc.)
Surface Preparation:
- The surface and ambient temperature should be at least 5* C and maximum 35* C
- The application surface should be clean and the elements that prevent adhesion (oil, dirt, dust, grease, paint, rust) should be cleaned from the surface
- The surface must be strong and of sufficient strength. Cement grout, uncoated concrete and plasters should be removed from the surface
- If necessary, the concrete surface must be roughened mechanically
- Any cracks, fractures, gaps and segregations on the surface should be repaired with suitable sealant, epoxy or cement based repair mortars
- Dilatations on the surface should be insulated with the appropriate polyurethane based filler material and dilatation tape
- Corner chamfers can be supported with appropriate repair mortar or chamfer tape
- As a result of these processes, dust and debris on the surface should be removed from the surface for the last time
Primer Application
- Can be applied to dry and moist surface without primer
- Dusting surfaces should be primed with TriRoof MultiFlex (FLEX) Primer
- To obtain a homogeneous primer mixture, the primer should be mixed with an electric mixer for 3-4 minutes, low speed (~ 300 - 400 rpm) or with suitable equipment. Do not mix at high
speed for a long time to prevent air bubbles - The prepared primer mixture is applied to the surface by brush, roller or airless spraying machines
- Consumption in single coat application is 200- 400 g / m2. Consumption may vary depending on surface permeability, weather conditions and technique of application
- Second coat application can be made when necessary.
Membrane Application
- TriRoof Hybrid Polymer HPX is ready for use. Do not add water or any solvent to dilute
- The product in the special aluminum package is mixed before use, then the package is cut from the corner with scissors and poured onto the application surface and applied to the surface with brush, short hair roll or notched trowel
- Application is made in 2 layers. It is recommended to apply the floors in such a way that the application directions are perpendicular to each other
- Consumption is 1.50 kg / m2 (1 mm) per layer
- It is recommended to reinforce large surfaces or areas with a risk of cracking above 25-30 m2 with geotextile after the application of the first layer. Second layer application is made on geotextile fabric
- Waiting time between coats varies between 12-24 hours depending on temperature and humidity
- Masking tape is used to ensure that the end points of the application surface are flat. The masking tape should be removed after 10 min
- In order to make the surface rough in application to be coated on the ceramic, before application of the top layer membrane, the surface is sprinkled with an average of 1,00 - 1,50 kg / m2 quartz sand